Feb-May 19 Crane set up of sling positions
9.20am – Set-up of sling positions and weighing of the Boat, 26800KG is it weighed in at.
CRUISE, DINE, DRINK
and
CELEBRATE
Book My Trip9.20am – Set-up of sling positions and weighing of the Boat, 26800KG is it weighed in at.
Boat being lifted in to the Leeds Liverpool Canal outside the Hotel. 8am – 300T Cramescene LTD crane setting up for the Lift.
Boats arrival at Rendezvous Hotel, Thomas and Edward Randell been greeted and congratulated by Mr Malcom Weaving, Proprietor of Rendezvous Hotel.
We had the boat transported to the Rendezvous Hotel in Skipton 55 miles from the shipyard in Ormskirk.
Thursday – 9th May 2019 – 12.30pm – Arrival at Rendezvous.
Thursday – 9th May 2019 – 8am – Boat lifted on the jacks at Burscough Boats, ready to allow the wagon to reverse under.
View of the bow of the Boat with the internal bulkheads been welded to the Base Plate.
Wednesday – 8th May 2019 – 10pm – Shell taking its first coat of undercoat ready for the move from Burscough to Skipton.
Burning the latenight Oil, This is 10pm the night before the move.
View of the bow of the Boat with the internal bulkheads been welded to the Base Plate.
First Stages of the boat building…joining of the base plates (12mm) and attaching the Base Chine Bar (Dia 45mm solid bar) to edge of Base Plate.